பவர் பிளாண்ட் பொருத்துதலுக்கான தள மதிப்பீட்டிற்கான பங்களிப்பு: நீரியல் பகுதி

Bouam A, Dadda A, Graîne H, Kadi R, Messen N and Koudiah N

The satisfaction of water needs is a very important exclusion criterion in the selection of sites for the installation of power plants (nuclear or fossil plants). It can only be considered acceptable if the cooling capacity is satisfactory. The identification of the best sites in the final choice depends on the total cost of the cold source. In this work, a computer code for calculating the cooling water requirements of a power plant using a universal wet tower has been established. The installation, taken as an example, is a power station up to 1200 MWEl in a site such as the highlands, have been studied. The computer code for the analysis of the closed cooling circuit, it allows to determine the losses by water evaporation and water deconcentration (dilution). The program is based on the analytical relationships of a hydrological balance applied in cooling tower using the NF E 38-423 French standard. The calculations were made in ambient temperature ranges, relative humidity and variable power levels, using average meteorological data for a region in the highlands of Algeria. The results obtained are in good agreement with those of an IAEA simulator "wamp" and with the operating data of a thermal installation given in the literature as the power plant of the French (EDF plant).

மறுப்பு: இந்த சுருக்கமானது செயற்கை நுண்ணறிவு கருவிகளைப் பயன்படுத்தி மொழிபெயர்க்கப்பட்டது மற்றும் இன்னும் மதிப்பாய்வு செய்யப்படவில்லை அல்லது சரிபார்க்கப்படவில்லை